Chevalier Apartments

Cascade Construction Limited was responsible for delivering a total of 63 housing units, which were assembled from modular components imported from China.

Client:

Pt Chevalier

Value:

$15M

Year completed:

Under Construction

Project duration:

48 months

Project Description

The project faced several challenges that required innovative solutions and adaptability throughout its build. The unexpected discovery of asbestos pipes and contaminated soil during excavation and groundwork disrupted the initial timeline, necessitating immediate remediation and mitigation measures. Additionally, introducing design enhancements in collaboration with Kainga Ora introduced complexity, requiring careful consideration, design development, and regulatory approvals.

This project is a beacon of innovation, from the transportation of modular components from China to their assembly in New Zealand.